GSR 999: from the national market to the Gradim quay
A site in Gradim, São Gonçalo (RJ), on Guanabara Bay, with a yard and quay to support receiving, processing and dispatch according to the project.

Brazil: a market that still exports the opportunity
Brazil accounts for less than 1% of world ship recycling and exports the opportunity: the FPSO Fluminense (126,330 t) was towed to Denmark for lack of a national yard.
The Hong Kong Convention entered into force on 26 June 2025. With it, competing for a national yard stops being only about price and becomes about compliance.
US$ 100 bn
estimated global decommissioning market by 2030, with more than 5,000 platforms
40%
of the world's offshore platforms out of operation by 2040
US$ 7.64 bn
estimated ship recycling and green steel market by 2032, growing about 10% a year
Third-party market estimates, not GSR measurements.
Rio de Janeiro: the announced demand
Petrobras plans to decommission 26 platforms by 2027, in a US$ 9.8 bn program. The site is about 180 km from the Campos Basin.
26
platforms to decommission by 2027, according to Petrobras' plan
US$ 9.8 bn
program value, according to Petrobras
≈180 km
from the site to the Campos Basin
The plan and its value are Petrobras', cited as context, not a GSR result.
São Gonçalo: the north-east shore of the bay and the naval cluster around it
The site is on the north-east shore of Guanabara Bay, in industrial zone Z4.
A consolidated naval cluster surrounds it: Estaleiro São Miguel (Grupo Bravante), Estaleiro Dock Brasil, Estaleiro Cassinú and Furnas.
Named as neighbors of the site; they do not indicate a commercial relationship with GSR.
Access
- By road
- BR-101 (Niterói–Manilha)
- By sea
- inside the bay, in pilotage zone ZP-15
- Rio–Niterói Bridge air draft
- 60 m
The site: Rua Manoel Duarte, 999

- Facility
- Rua Manoel Duarte, 999 — Gradim
São Gonçalo — RJ - Coordinates
- -22.8327, -43.0950
~100 m
of natural sea frontage
Installed on site
- Access pier and existing quay
- Shed
- Effluent treatment and oil/water separator
Expanding on piles, not on landfill
GSR's engineering choice for expanding the site is a piled structure over the water, not landfill.
Illustrative diagram, not to scale.
Lower environmental footprint
Beside the neighboring mangrove and Permanent Preservation Area (APP), a piled structure has a lower environmental footprint than landfill.
More viable licensing
On piles, licensing is more viable than with landfill.
Access, draft, berthing, availability and licensing requirements are confirmed project by project.
Expansion facilities are not presented as available capacity.